House: 3rd floor and roof

Snapshot_016Snapshot_017Snapshot_018

I did some serious crunching the past days, the 3rd floor is 95% complete with doors, labels,  also the roof is in place and most of the exterior walls are lined up.

Leave a Reply

About Me
I started SecondLife in 2004 and created my own bdsm fetish virtual products under the name KDC. I'm also a php/mysql programmer, 3D artist and game designer.


How would you rate the Warden Straitjacket struggle minigame?

  • Too hard. (33%, 3 Votes)
  • Just right. (56%, 5 Votes)
  • Too easy. (11%, 1 Votes)

Total Voters: 9

Loading ... Loading ...
Archives